In the service of beauty  - Higher energy efficiency at L`Oréal in Karlsruhe/Germany

The cosmetics group L`Oréal has defined environmental protection as an important corporate objective. This goal will not only be implemented in the production process but also in building automation.  At their location in Karlsruhe the heating system has just been modernized – with savings and solutions from VIPA.

Accurate monitoring of the water and energy consumption

The name L`Oréal stands for cosmetics, and hair and skin care worldwide. For Germany and parts of Europe, the consumer brands, L`Oréal Paris and Garnier, are produced in Karlsruhe, the only German production center of the group,. The high ethical principles of this global player are remarkable. Besides other aspects, L`Oréal pays attention to water and energy consumption. Nearly all factories have an emission permit in accordance with ISO 14001 and a safety certificate in accordance with OHSAS 18000 or OSHA VPP. Consequently, also in building technology, the company places a great deal of emphasis on sustainability and energy efficiency. The existing heating was replaced with district heating and a new controller. Because they had already managed several joint projects successfully, the company Khim Automation, from nearby Hambrücken, was also to manage the control and automation engineering at L'Oréal.

Specialists rely on PLC engineering

Khim has specialized in technical building automation and HKL, whereby the focus is on energy controlling, savings, and networked systems.

As the conversion had to be completed during operation - also at the weekends - one area after another was modernized according to the requirements of the production. So after 3 months the heating in the production was completely converted. There were several reasons for Khim to rely here on PLC engineering instead of on systems such as BACnet, KNX or LON which are usually used in building technology. PLC engineering can be found everywhere in industry and there are staff there who are very familiar with it. Spare parts are in house and the customer can mostly deal with faults or changes himself without any delay. In addition the STEP7 compatibility, the interfaces to PROFIBUS, and the performance capability of the CPU to process and reliably store large amounts of data, spoke for VIPA and their SPEED7 CPUs. All required interfaces are on board with VIPA CPUs as standard, and the capacity is sufficient to process the 90 parameters which accrue per control module in this project.

Two CPUs 315SN-NET control the entire energy distribution – together with decentralized SLIO modules

Two CPUs of the type 315-4NE12 Ethernet now control the right temperature of the entire building in Karlsruhe. 18 VIPA SLIO module units are connected decentralized over the entire factory on 4.5 kilometers of Profibus cable, strengthened by repeaters. They control the energy distribution on site and ensure that the return per consumption unit does not rise above the desired value - otherwise the amount will be throttled. The success of modernization has exceeded all expectations. Heating costs could be significantly reduced and thus the company's goal of sustainability further promoted.